While I was waiting for something to dry on another project in the Montreal part of the layout, I decided it would be a good idea to spend some time replacing the track ties in that area. These were the ties I needed to remove so I could install rail joiners when I was laying track. I used a spare piece of pre-painted track and then cut the number of ties I needed in that space. I cut off all of the track spike detailing, so the top of the tie was flush and then inserted the ties back under the rails. A pretty simple process that up until now was a victim of procrastination. I now just need to do the same thing to the rest of the layout.
 |
| A before image of missing ties in the yard. Look at all that ballasting that still needs to be done. |
 |
| Another before image. |
 |
| An after image of the same location as the previous picture. These tracks leading to Gare Centrale (Central Station) look much better with all of their rail ties. |
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.